Skip to content
← Back to technical library

Drawings & DFM

CNC RFQ drawing checklist: revisions, tolerances and purchasing inputs

Match CAD revisions, identify function-critical dimensions, and prepare material, quantity, finishing and inspection requirements before requesting a quote.

Key engineering considerations

01

Align the model, drawing and controlling revision

A 3D model is useful for understanding geometry and planning manufacturing, while a 2D drawing or an approved model-based definition can communicate critical dimensions, tolerances, datums, threads and surface requirements. Identify which document controls when details disagree. Check the drawing number, revision, issue date, units (mm or inches), and the corresponding CAD model revision. If the model and drawing conflict, obtain a corrected, authorized definition rather than asking a supplier to guess. STEP/STP is a common example of neutral geometry exchange, not a claim that this website currently accepts any CAD file format.

First check: part identifier, revision, units, model/drawing consistency, controlling specification, and approval authority.
02

Separate functional tolerances from general dimensions

Start with the features that affect assembly, fit, sealing or motion instead of applying unnecessarily restrictive tolerances to every dimension. If geometric tolerancing is used, identify the governing standard and datum reference scheme so that the design intent can be interpreted consistently. Threads, blind-hole depth, inaccessible pockets, small internal radii and thin walls can affect fixturing and tool access. Whether a specific tolerance is achievable depends on the actual material, equipment, setup and measurement method; a buyer should not assume a supplier can hold an arbitrary value simply because a drawing specifies it.

Mark why each critical feature matters and whether it needs inspection. Do not infer a supplier's guaranteed tolerance from industry examples.
03

Make technical and commercial quote inputs comparable

State the material grade, condition and applicable specification rather than using only a broad family name. Include expected quantity and repeat-order assumptions, surface finishing or treatment requirements, operating environment, and requested delivery target. Ask what inspection records, material documentation or first-article checks are necessary, who would issue them, and whether they are included in the offer. A buyer's desired delivery date is not a confirmed manufacturing promise.

Minimum inquiry brief: grade and condition, quantity, finish, critical dimensions, inspection evidence and desired schedule; supported submission channels remain unverified.