Skip to content

From drawing requirements to inspection criteria.

Explore dimensions, drawing revisions, inspection requirements and documentation for machined parts.

Precision measurement reference photograph, not RayTech inspection equipment

Agree on what must be checked before measuring.

01

Dimensions and tolerance

Critical dimensions, general tolerance, datums and functional fit

02

Form and position

Flatness, concentricity, position and any specified GD&T

03

Surface and appearance

Roughness, scratches, deburring and finish requirements

04

Material and treatment

Required material grade, heat-treatment and finish evidence

Quality review across more than one stage.

  1. 01

    Requirement review

    Confirm drawing revision, critical features and inspection needs

  2. 02

    First-piece consideration

    Agree what would need validation on an initial part

  3. 03

    In-process checkpoints

    Define checks relevant to the manufacturing process

  4. 04

    Pre-dispatch review

    Review dimensional, visual and documentation needs

  5. 05

    Records and response

    Agree ownership of records and issue resolution

The drawing defines the measurement question.

DATUM ADIAMETER ØPOSITIONSURFACE
Precision measurement reference photograph, not RayTech inspection equipment

Evidence matters more than an equipment list.

METHOD / 01

Dimensional checks

Evaluate suitable gauges, calipers or micrometers

METHOD / 02

Geometric checks

Assess whether CMM or another validated method is needed

METHOD / 03

Surface review

Define surface, appearance and finishing requirements

Quality paperwork must be verifiable, not decorative.

DOC / 01
Illustrative documentation or measurement photo, not a RayTech-issued record

Dimensional inspection report

Critical dimensions, measured results and drawing revision

DOC / 02
Illustrative documentation or measurement photo, not a RayTech-issued record

Material / process evidence

Material grade or heat-treatment and finish documents

DOC / 03
Illustrative documentation or measurement photo, not a RayTech-issued record

First-article records

Initial-part checkpoints and approval needs

What happens when a requirement is not met?

01

Identify the gap

Which drawing, appearance or document requirement differs?

02

Contain and decide

Who decides whether the affected lot is acceptable?

03

Correct and review

How are rework, replacement and exceptions agreed?

Connect drawing revisions to inspection responsibility.

DRAWING

Drawing ID and revision

LOT / PART

Batch and part identity

CHECK

Inspection result and approval

SUPPLY

Outside operations and dispatch

Quality documentation checklist

01

Instruments

Equipment list, access relationship and authorized photos

02

Inspection reports

An approved and redacted sample document

03

Certifications

Certificate original, validity and scope

04

Operational responsibility

Who inspects, subcontracts and resolves issues

Common questions before quality sign-off

Can I request an inspection report?

Issuance, measurement coverage, report format and responsible personnel have not been confirmed.

Are tight tolerances guaranteed?

Tolerance feasibility depends on material, geometry, setup, measurement methods and drawing requirements.

Define quality requirements alongside the drawing.